Smart industry testing for systems that can’t fail

When software controls tunnels, storm barriers or production lines, a failure costs more than a bug report. We test hardware and software together, as close to production as we can get.

THE CHALLENGE

Why testing critical systems is different

In infrastructure and industry, software doesn’t live on its own. It steers machines, and people depend on it.

Many systems, one chain

Subsystems have to work together, from each single component to the full end-to-end chain.

IT meets OT

New software has to work with existing hardware and control systems.

No standard to follow

One-of-a-kind systems need a test approach built for them.

Failure is not an option

The consequences of a failure go far beyond downtime.

OUR APPROACH

How we test

We test the system as it will really run: hardware and software together, under the conditions it has to survive.

Hardware and software integration testing

Test setups that replicate production as closely as possible

Simulated equipment failures, emergencies and real traffic conditions

Failover tests: backup systems must switch on straight away

A risk-based test strategy (TMap) that evolves with the findings

Operators who test under our guidance

Technician in a blue safety helmet standing next to the control panel of a machine in a factory hall

IN PRACTICE

What this looks like in practice

A new motorway tunnel

Integration testing of tunnel installations, traffic control and monitoring, in a purpose-built test facility. Including extensive failover tests.

A storm surge barrier

New operating software for a one-of-a-kind barrier. A risk-based TMap strategy, operators testing under guidance, and external influences simulated.

A data warehouse

A faster ETL test strategy based on small datasets, automated with tools like Pytest and Great Expectations.

EXPAND YOUR TEAM

Experienced testers in your project team

Our test consultants join your project, from test strategy to hands-on testing. They know what it takes when the system steers something physical.

FAQ

Frequently asked questions

Which domains do you work in?

Infrastructure and industrial systems, such as tunnels, storm barriers and control systems, and the data behind them. We’ve combined software testing with IT/OT integration for more than a decade.

Can you test before the system goes live?

Yes. We test in setups that replicate production as closely as possible, so failures and emergencies can be simulated safely.

How do you decide what to test first?

With a risk-based strategy: what would hurt most if it failed is tested first and deepest. The strategy evolves as the findings come in.

Do you work with our own engineers and operators?

Yes. Operators can test under our guidance, so the people who run the system know it works.

Tell us about the system you need to test, and we’ll show you how we’d approach it.